Mounting GB and GNNP Vibration Isolators

gb gb

Order of operations:

1. lift a machine higher than a vibration isolator

 

 

2. slide the vibration isolators under the mounting holes in the base of a machine

 

 

3. insert the mounting screws into the mounting holes and pre-screw to the threaded bushings of the vibration isolators

4. lower the machine onto the vibration isolators

5. level the machine by turning the mounting screw right – lifting, left – lowering, level evenly on all mounting screws

6. secure the leveling of a machine by clamping a spring washer on the mounting screws using a locknut

7. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required

gb gb
GB type Vibration Isolator GNNP type Vibration Isolator

A machine should be leveled at a minimal distance from the floor.