Mounting GB and GNNP Vibration Isolators
![]() |
![]() |
Order of operations:
1. lift a machine higher than a vibration isolator
2. slide the vibration isolators under the mounting holes in the base of a machine
3. insert the mounting screws into the mounting holes and pre-screw to the threaded bushings of the vibration isolators
4. lower the machine onto the vibration isolators
5. level the machine by turning the mounting screw right – lifting, left – lowering, level evenly on all mounting screws
6. secure the leveling of a machine by clamping a spring washer on the mounting screws using a locknut
7. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required
![]() |
![]() |
GB type Vibration Isolator | GNNP type Vibration Isolator |
---|
A machine should be leveled at a minimal distance from the floor.