B type plate vibration isolators installation

Screw 1 - for threaded blind holes a screw
is inserted into a bushing of a vibration isolator

gb gb gb

Order of operations:

1. lift a machine

2. screw the mounting screws into the threaded holes in the base of a machine

3. slide the vibration isolators under the cylindrical points of the mounting screws

4. lower a machine inserting the cylindrical points of the mounting screws into the bushings of the vibration isolators

5. level the machine by turning the mounting screw right – lifting, left – lowering, level evenly on all mounting screws

6. secure the leveling of a machine by clamping a spring washer on the mounting screws using a locknut

7. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required.

A machine should be leveled at a minimal distance from the floor.

Screw 2A - for unthreaded through holes a screw
is inserted into a bushing of a vibration isolator

gb gb gb

Order of operations:

1. lift a machine

2. slide the vibration isolators with inserted mounting screws under the holes in the base of a machine

3.lower a machine inserting the mounting screws into the holes in the base of the machine

4. level a machine by turning the lower leveling nuts right – lifting, left – lowering, level evenly on all mounting screws

5.secure the leveling of a machine by clamping a spring washer on the mounting screws using the upper locknut

6. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required

A machine should be leveled at a minimal distance from the floor.


Screw 2A - for threaded through holes a screw
is inserted into a bushing of a vibration isolator

gb gb

Order of operations:

1. lift a machine

2. screw the mounting screws into the threaded holes in the base of a machine

3. slide the vibration isolators under the cylindrical points of the mounting screws

4. lower a machine inserting the cylindrical points of the mounting screws into the bushings of the vibration isolators

5. level the machine by turning the mounting screw right – lifting, left – lowering, level evenly on all mounting screws

6.secure the leveling of a machine by clamping a spring washer on the mounting screws using the upper locknut

7. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required.

A machine should be leveled at a minimal distance from the floor.

Screw 2B - for unthreaded through holes a screw
is inserted into a bushing of a vibration isolator

gb gb gb

Order of operations:

1. lift a machine

2. slide the vibration isolators with tightly screwed in mounting screws under the holes in the base of a machine

3. lower a machine inserting the mounting screws into the holes in the base of the machine

4. level a machine by turning the lower leveling nuts right – lifting, left – lowering, level evenly on all mounting screws

5. secure the leveling of a machine by clamping a spring washer on the mounting screws using the upper locknut

6. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required.

A machine should be leveled at a minimal distance from the floor.

Screw 2B- for threaded through holes a screw
is inserted into a bushing of a vibration isolator

gb gb gb

Order of operations:

1. screw the mounting screws tightly into the threaded bushings of the vibration isolator

2. lift a machine

3. screw the vibration isolators tightly into the threaded holes in the base of a machine

4. lower the machine with the screwed in vibration isolators

5. secure the screwing of a machine with the vibration isolators by clamping a spring washer on the mounting screws using a locknut

Socket – for fixing a cotter:

gb gb

Order of operations:

1. lift a machine

2. screw the cotters into the threaded holes in the base of a machine

3. slide the vibration isolators under the cotters

4. lower a machine inserting the cotters into the bushings of the vibration isolators

5. level a machine by turning the cotters left – lifting, right – lowering, level evenly on all cotters

6. secure the leveling of a machine by clamping a spring washer on the cotters using a locknut

7.verify the leveling of a machine after ca 1 week of operation and correct the leveling if required.

A machine should be leveled at a minimal distance from the floor.


Socket – for fixing a threaded mandrel

gb gb

Order of operations:

1. lift a machine

2. screw the threaded mandrels into the threaded holes in the base of a machine

3. slide the vibration isolators under the cylindrical points of the threaded mandrels

4. lower a machine inserting the cylindrical points of the threaded mandrels into the bushings of the vibration isolators

5. level a machine by turning the threaded mandrels left – lifting, right – lowering, level evenly on all threaded mandrels

6. secure the leveling of a machine by clamping a spring washer on the threaded mandrels using a locknut

7. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required.

A machine should be leveled at a minimal distance from the floor.