B type plate vibration isolators installation
Screw 1 - for threaded blind holes a screw is inserted into a bushing of a vibration isolator
![]() |
![]() |
![]() |
Order of operations:
1. lift a machine
2. screw the mounting screws into the threaded holes in the base of a machine
3. slide the vibration isolators under the cylindrical points of the mounting screws
4. lower a machine inserting the cylindrical points of the mounting screws into the bushings of the vibration isolators
5. level the machine by turning the mounting screw right – lifting, left – lowering, level evenly on all mounting screws
6. secure the leveling of a machine by clamping a spring washer on the mounting screws using a locknut
7. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required.
A machine should be leveled at a minimal distance from the floor.
Screw 2A - for unthreaded through holes a screw
is inserted into a bushing of a vibration isolator
![]() |
![]() |
![]() |
Order of operations:
1. lift a machine
2. slide the vibration isolators with inserted mounting screws under the holes in the base of a machine
3.lower a machine inserting the mounting screws into the holes in the base of the machine
4. level a machine by turning the lower leveling nuts right – lifting, left – lowering, level evenly on all mounting screws
5.secure the leveling of a machine by clamping a spring washer on the mounting screws using the upper locknut
6. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required
A machine should be leveled at a minimal distance from the floor.
Screw 2A - for threaded through holes a screw
is inserted into a bushing of a vibration isolator
![]() |
![]() |
Order of operations:
1. lift a machine
2. screw the mounting screws into the threaded holes in the base of a machine
3. slide the vibration isolators under the cylindrical points of the mounting screws
4. lower a machine inserting the cylindrical points of the mounting screws into the bushings of the vibration isolators
5. level the machine by turning the mounting screw right – lifting, left – lowering, level evenly on all mounting screws
6.secure the leveling of a machine by clamping a spring washer on the mounting screws using the upper locknut
7. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required.
A machine should be leveled at a minimal distance from the floor.
Screw 2B - for unthreaded through holes a screw
is inserted into a bushing of a vibration isolator
![]() |
![]() |
![]() |
Order of operations:
1. lift a machine
2. slide the vibration isolators with tightly screwed in mounting screws under the holes in the base of a machine
3. lower a machine inserting the mounting screws into the holes in the base of the machine
4. level a machine by turning the lower leveling nuts right – lifting, left – lowering, level evenly on all mounting screws
5. secure the leveling of a machine by clamping a spring washer on the mounting screws using the upper locknut
6. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required.
A machine should be leveled at a minimal distance from the floor.
Screw 2B- for threaded through holes a screw
is inserted into a bushing of a vibration isolator
![]() |
![]() |
![]() |
Order of operations:
1. screw the mounting screws tightly into the threaded bushings of the vibration isolator
2. lift a machine
3. screw the vibration isolators tightly into the threaded holes in the base of a machine
4. lower the machine with the screwed in vibration isolators
5. secure the screwing of a machine with the vibration isolators by clamping a spring washer on the mounting screws using a locknut
Socket – for fixing a cotter:
![]() |
![]() |
Order of operations:
1. lift a machine
2. screw the cotters into the threaded holes in the base of a machine
3. slide the vibration isolators under the cotters
4. lower a machine inserting the cotters into the bushings of the vibration isolators
5. level a machine by turning the cotters left – lifting, right – lowering, level evenly on all cotters
6. secure the leveling of a machine by clamping a spring washer on the cotters using a locknut
7.verify the leveling of a machine after ca 1 week of operation and correct the leveling if required.
A machine should be leveled at a minimal distance from the floor.
Socket – for fixing a threaded mandrel
![]() |
![]() |
Order of operations:
1. lift a machine
2. screw the threaded mandrels into the threaded holes in the base of a machine
3. slide the vibration isolators under the cylindrical points of the threaded mandrels
4. lower a machine inserting the cylindrical points of the threaded mandrels into the bushings of the vibration isolators
5. level a machine by turning the threaded mandrels left – lifting, right – lowering, level evenly on all threaded mandrels
6. secure the leveling of a machine by clamping a spring washer on the threaded mandrels using a locknut
7. verify the leveling of a machine after ca 1 week of operation and correct the leveling if required.
A machine should be leveled at a minimal distance from the floor.